Project Overview
Cynthia Rivers purchased her Kensington home in 2008. By 2025, the home required urgent structural and building envelope repairs. Water intrusion caused the kitchen floor to deteriorate, attracting a termite infestation that silently ate away at structural framing. Ms. Rivers feared anyone walking into the room could get injured.
Built to Last intervened, layering a capital stack of funds raised through green bank affiliate Philadelphia Green Capital Corp (PGCC) and from the U.S. Housing and Urban Development (HUD) Healthy Homes program, administered by the Energy Coordinating Agency. Ms. Rivers’ home was restored to a safe, healthy, and stable condition.
Electric Range
Energy Star® certified
50%
Fewer indoor contaminants
200 kWh
Annual energy savings

The Challenges
Over the years, Ms. Rivers frequently stepped away from employment to care for friends and family members, diminishing her savings. When persistent water intrusion and termites damaged the kitchen’s subfloor, she drew further from those savings, hiring a local contractor to complete the repairs. The contractor removed her sink and replaced it with an outdoor garden hose brought in through the kitchen window. Unexpectedly and abruptly, the contractor abandoned the job, leaving Ms. Rivers without a functional kitchen. Her home was left in a precarious condition.
The Solution
Built to Last developed a comprehensive restoration plan alongside construction manager Habitat for Humanity Philadelphia. Critical structural repairs and kitchen rehabilitation work were combined with building envelope and clean energy upgrades.
Project Scope
- Roof Replacement & Building Envelope Repairs: Installed new roofing system above the kitchen; new skylight to stop water intrusion; drain boxes, downspouts, and gutters; masonry patching and hydraulic cement sealing.
- Plumbing Infrastructure: Replaced a failed rain leader; updated interior cast iron drain lines to PVC; reconnected kitchen plumbing lines.
- Structural & Pest Remediation: Exterminated termites; replaced damaged joists and subfloor.
- Kitchen Upgrades & Electrification: Installed new base and wall cabinets and countertops; replaced electrical system with new GFCI receptacles and dedicated 20-amp circuits; upgraded range hood and installed a modern electric range.



